Introduction & Basic Concept

  • Solar/wind fastest growing energy sources but intermittent problem
  • Need electricity storage for peak demand periods
  • Pumped hydro storage: simple, reliable scheme used for decades, now back in vogue
  • Basic concept: "lake up a hill" - upper and lower reservoirs connected to facility

How Pumped Storage Works

  • Upper reservoir larger (energy storage location)
  • Off-peak hours: excess power pumps water to upper reservoir
  • Peak hours: water released down through turbine to lower reservoir, generates power
  • Core goal: time shifting - convert cheap off-peak energy to expensive on-peak energy
  • Can "buy low, sell high"
  • Energy capacity measured by upper reservoir volume and height differential
  • Cycle efficiency: 70-80% energy recovery (20-30% loss)

Types of Pumped Storage Systems

Pure/Closed Loop Systems

  • Only pumps water in reservoirs without natural inflow
  • Examples:
    • France's Montezic: 910 MW capacity, country's second largest
    • Australia's Kidston: 250 MW, first in 40 years, uses former mining pits
  • Less environmental impact, more location flexibility
  • Uncommon, environmental impact not well studied

Open Loop Systems

  • One/both reservoirs connected to naturally flowing water source
  • All 43 US existing stations are open loop
  • Often built onto existing hydroelectric projects
  • Cheaper to build but more dependent on seasonal variations
  • Example: San Diego Hodges Reservoir 40 MW facility (recently offline due to low water)

Variants

  • Underground systems: surface upper reservoir, underground lower reservoir hundreds of feet down
  • Uses caverns/abandoned mines (technical risks: stability, explosive mine gas)
  • Seasonal systems: long-term water storage, pump during rainy seasons, release during dry for electricity + water supply

Historical Development

Early Period (1900s-1950s)

  • First facilities in Alpine Europe (elevation differences + water availability)
  • 1909: First system in Schaffhausen, Switzerland (separate pumps/turbines)
  • 1930s: 40 facilities across Europe
  • 1929: First US utility-scale at Connecticut Light & Power's Rocky River ($6 million)
    • Connected to Housatonic River, pumped to Candlewood Lake
  • Pre-1950s: separate pumps and turbines (better efficiency, higher cost)

Technological Breakthrough (1950s)

  • 1956: Tennessee Valley Authority's Hiwassee Dam Unit 2
  • World's largest reversible turbine (combined pump/power generation)
  • Single unit arrangement replaced separate systems

Nuclear Era Integration (1960s-1980s)

  • Nuclear energy continuous/inflexible output needed time shifting
  • Pumped storage perfect solution for nuclear baseload
  • Two technologies highly bound together
  • Reservoirs placed between nuclear stations and population centers
  • 1970s energy crisis: massive investments in energy generation + pumped storage

Major Construction Projects

  • Bath County, Virginia (1977-1985): $1.6 billion, 2.1 GW capacity, world's biggest for 40+ years
  • Japan: mountainous terrain + nuclear push, built many large facilities
    • Okutataragi: one of world's largest
  • Europe: 80% of existing systems built 1960s-1990s
    • France's Grand Maison Dam, Germany's Markersbach plant

Construction Boom End (1990s)

Reasons for Decline

  • Nuclear energy decline (regulation, overexpansion, negative incidents)
  • Environmental/location issues: need specific terrain (hundreds of meters vertical separation)
  • Surface facilities require dams in scenic areas (disruptive to environment/communities)
  • Best sites already built out, remaining sites suboptimal
  • Japan example: Okinawa Yanbaru seawater prototype (¥3.2 billion, eventually dismantled 2016)

Market Structure Changes

  • Pre-1990s: vertically integrated utility monopolies (generation + transmission)
  • 1990s: competitive wholesale markets, independent companies allowed
  • Changed economics: utilities could justify $1-2 billion upfront + 20-30% efficiency loss
  • Deregulated markets closed peak/off-peak price gaps
  • Asset cost recovery more uncertain
  • Rise of LNG contributed to investment decline

Modern Revival (2000s-Present)

China's Massive Expansion

  • Intermittent solar/wind renewal driving pumped storage interest
  • State-owned utilities (State Grid of China - world's 3rd largest company by revenue)
  • Started 1990s, caught up fast
  • 2014: 22.6 GW (3rd globally behind Europe/Japan)
  • Mid-2024: 50 GW installed capacity
  • World's largest single facility: Fengning (3.6+ GW)
  • Projections: 63 GW by end 2025
  • Long-term goal: 305 GW by 2035 (2021 National Energy Administration document)

Other Regions' Modest Growth

Japan

  • New projects ongoing: Kanagawa Hydro units 3-6 (will be world's 3rd biggest)

Europe

  • Energy crisis made high capacity storage attractive
  • Projects in Switzerland, France, Italy, Albania, Bulgaria
  • Scotland wind energy projects
  • Loch Ness project (2024): 2 GW capacity, 400,000 households
  • Concerns: water levels, Atlantic salmon, "monster"

United States Challenges

  • Intermittent renewables + 2022 Inflation Reduction Act tax credits
  • Federal Energy Regulatory Commission: 24 permitted projects
  • No large-scale completion since 1985 Bath County
  • No project of any size since 2012 Hodges Lake
  • Eagle Mountain example: 1.3 GW project
    • Applied 2009, authorized 2014, still delayed 11 years
    • Litigation over 35 billion gallons desert groundwater over 50 years
    • Joshua Tree National Park concerns

Battery Energy Storage Systems (BESS) Competition

BESS Characteristics

  • Utility-scale lithium-ion battery enclosures
  • Less energy storage but more flexibility/cycle efficiency
  • Easier to build: standard shipping containers moved to site
  • Fast growing in Texas/California (sun/wind regions)

Market Shift

  • Pre-2024: pumped storage largest US utility storage (20-22 GW)
  • 2024: US nearly doubled battery storage
  • BESS now ahead: 29 GW power generating capacity
  • High installation speed vs slow pumped storage projects

Future Outlook

Complementary Roles

  • Pumped storage: longer duration power (overnight), large capacity niche
  • BESS: fast ramp-up situations
  • BESS issues: technology complexity, supply chain concerns, fire risks

Challenges

  • Pumped storage must overcome substantial local challenges
  • Hydroelectric project difficulties in US and most of world
  • Economics and use cases need to justify environmental/regulatory hurdles

TwinMind

Get summaries like this for your own meetings

TwinMind takes notes in the background during meetings, lectures, and calls, then writes the summary for you.

Free plan to get started

No bot joins your calls

Phone, desktop & Chrome apps

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome