Building the impossible: Golden Gate Bridge - Alex Gendler
TED-Ed
5m 27s
Project Background & Opposition
- Mid-1930s bridge construction project in California
- Lead engineers: Charles Ellis and Joseph Strauss
- Major opposition faced before construction:
- Military feared bridge would make harbor vulnerable target
- Ferry companies claimed bridge would steal business
- Residents wanted to preserve natural scenery
- Many engineers thought project impossible
Environmental Challenges
- Golden Gate Strait conditions:
- 96 kilometer per hour winds
- Swirling tides
- Endless blanket of fog
- Earthquake-prone San Andreas fault location
Design Evolution
- Strauss initially planned cantilever bridge design:
- Single beam anchored at one end, extended horizontally like diving board
- Limited extension before collapsing under own weight
- Design used two cantilevers linked by middle structure
- Ellis and Leon Moyesife convinced switch to suspension bridge:
- Deck suspended from cables strung across gap
- More flexible structure, resilient to winds and shifting loads
- Based on small rope bridge principles
- 1930s advanced steel manufacturing enabled bundled wire cables
Bridge Specifications & Manufacturing
- Longest and tallest suspension bridge ever attempted at the time
- Tower specifications:
- Height: 227 meters into sky
- Weight: 22,000 tons each
- Originally built in Pennsylvania
- Dismantled, packaged, shipped piece by piece
- Transport distance: 4,500 kilometers
- Manufacturing constraints:
- Cables and towers could only be built at large steel works on East Coast
- Recently completed Panama Canal enabled shipping components to California
Construction Challenges
North Tower
- Relatively easy to find stable shallow foundation
South Tower
- Required building essentially 10-story building underwater
- Strait's depth prevented drilling or digging foundations
- Construction methods:
- Bombs dropped on ocean floor to create openings for pouring concrete
- Seawall built to protect site from powerful currents
- Workers operated in 20-minute shifts between tides
- Each worker carried set of plans to prevent getting lost (due to many compartments)
- Earthquake during construction rocked South Tower nearly 5 meters in each direction
Safety Measures & Incidents
- Strauss prioritized worker safety:
- Required hard hats at all times
- Stretched safety net below towers
- Major accident in 1937:
- Entire scaffolding platform fell
- 10 workers killed
Final Construction Phase
- Cable spinning and installation:
- Cables spun in place
- Suspenders hung at 50-foot intervals
- Concrete roadway laid down
Bridge Painting Decision
- Steel initially coated with reddish paint primer during production
- Navy pushed for tactical black and yellow paint scheme
- Consulting architect Irving Morrow advocated for primer color:
- Thought primer paired nicely with Strait's natural backdrop
- Cited numerous letters from locals supporting the color
- 30-page pitch for International Orange color
- Final decision: International Orange chosen over Navy's plans
- Color complements Strait's blue water, green hills, and rolling fog