ToolGauge Facility Overview

  • 80,000 square foot facility in Tacoma, Washington
  • Built primarily to support Boeing aircraft manufacturing
  • Unfinished space intended for parts prep before enclosed paint booth
  • Hundreds of parts per single aircraft wing

Aviation Industry Crisis Context

  • Boeing delivered only 28 aircraft in Q3 (dramatic drop)
  • Most destructive event for entire industry since 9/11
  • 9/11 described as "blip on radar screen" compared to pandemic impact
  • Boeing shed 19,000+ workers
  • Thousands laid off across travel industry
  • Further federal aid uncertain, more aerospace layoffs expected

Pre-Pandemic Challenges

  • Boeing 737 MAX crisis began before COVID-19
  • Two fatal crashes led to MAX grounding March 2019
  • Initially expected months-long grounding extended over a year
  • Production halt of MAX in January created backlog of finished jets
  • Major suppliers responded with cuts

COVID-19 Impact on Travel

  • Passenger volumes plummeted March 2020 due to lockdowns/travel restrictions
  • April volumes down 95% compared to previous year
  • International travel restrictions hurt wide-body aircraft demand
  • All aircraft programs affected - "nothing was safe for supply chain"

Boeing Production Rate Changes

  • 2019: Produced 750 aircraft
  • 2020 forecast: Around 240 planes
  • Pre-2020: 14 787s and 5 777s per month
  • Post-COVID cuts: 6 787s and 2 777s per month planned for next year
  • MAX production increase delayed until 2022

ToolGauge Business Profile

  • 75% of business direct to Boeing or tier-one suppliers
  • Specializes in wide-body aircraft parts (787, 777X engines)
  • 40+ year relationship with Boeing - never lost contract
  • Built business year-over-year through contract renewals/expansions

ToolGauge Crisis Response

  • June layoffs: 190 employees reduced to 80
  • Shift changes: From three 8-hour shifts to one 10-hour shift
  • Business closed Fridays
  • Employees assumed multiple roles
    • Scheduling/production planning expanded to customer service, assembly, machining

Recovery Signs and Outlook

  • Slowly ramping up production
  • Rehiring laid-off workers (not hiring new)
  • Optimism based on:
    • Pending MAX return to service
    • Expected travel recovery with vaccine availability

Industry Recovery Projections

  • ToolGauge estimate: 1.5-2 years to pre-COVID production rates
  • Boeing projection: 3 years for travel to return to 2019 levels
  • Some analysts pessimistic: Recovery not until 2024, full recovery end of decade
  • Boeing forecast: Pandemic reduces global jetliner demand by 2,000 planes over next decade

Strategic Adaptations

  • Deferring planned investments in new facility
  • Seeking complementary work outside commercial aerospace
  • Revenue growth curve flattened for next 2 years before expected uptick
  • Long-term investment approach maintained despite uncertainty

TwinMind

Get summaries like this for your own meetings

TwinMind takes notes in the background during meetings, lectures, and calls, then writes the summary for you.

Free plan to get started

No bot joins your calls

Phone, desktop & Chrome apps

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome