How It's Made: Septic Tanks

How It's Made: Septic Tanks

Science Channel

Science Channel

Septic Tank Overview

  • Perfect sewage treatment solution for houses not connected to sewage network
  • Collects and treats domestic wastewater using bacterial process to decompose waste
  • Filters dirty water before recycling back into ground
  • Usually made of concrete with access covers on top
  • Waste treatment occurs in separate chambers inside tank

Rebar Reinforcement Construction

  • Steel bars (rebars) reinforce concrete structure
  • Welder assembles rods to form cage
  • Spot welds rebar with mid welding torch
  • Welded cage maintains structural integrity
  • Worker measures cage diagonals to ensure straightness
  • Rebar spacers placed to keep cage centered in mold and leveled on floor

Formwork Setup

  • Crane lowers rebar cage into custom formwork made of high strength steel plates
  • Workers close walls around form and secure with heavy duty locks
  • Crane lowers machined steel cores to form interior walls of tank chambers
  • Rigid plastic tube inserted inside rubber sleeve to create flow hole between chambers
  • Worker cuts holes in rebar for access openings using acetylene torch
  • Mold allows concrete to flow over rebar and embed access opening covers in septic tank lid

Concrete Pouring Process

  • Workers pour over 1,300 gallons of wet concrete into mold
  • Use stick vibrator to eliminate air pockets
  • Level walls with putty knife
  • Mix more concrete and pour over top slab rebar
  • Concrete blocks used to prevent plastic covers from floating in wet concrete
  • One worker pours concrete while other consolidates mixture with vibrating stick
  • Worker levels top of slab with trowel

Tank Removal and Finishing

  • After concrete cures, workers strip forms
  • Remove concrete tank using overhead crane and compressed air system
  • Compressed air forces mold away from concrete tank
  • Crane takes strip core away for cleanup
  • Worker brushes top of walls and sweeps floor inside tank
  • Applies butel rubber tape around top of exterior wall for watertight seal between tank and lid

Lid Installation and Final Assembly

  • Overhead crane lifts lid out of formwork and brings to tank mold
  • Crane slowly lowers lid onto tank
  • Workers keep aligned to ensure proper seal
  • Label tank to indicate capacity
  • Mold opened revealing finished septic tank
  • Rubber sleeve molded into wall ensures watertight connection between pipe from home and tank

Installation and Capacity

  • Tank set in ground at client's home using radio remote controlled knuckle boom crane
  • Tank provides three bedroom house with fully independent sewage system