Initial Discovery (1978)
- Diane Hartley writing undergraduate architecture thesis on Citicorp Center
- Discovered potentially deadly structural mistake in 59-story Manhattan skyscraper
- Oversight threatened to topple tower into densely populated district
Building Design and Construction
- Built 1977, one of world's tallest buildings at time
- Unique sloped roof design
- Distinctive base structure:
- St. Peter's Lutheran Church occupied corner of construction site
- Building supported on stilts at center of each side (not corners)
- Novel design worried building backers
Original Safety Measures
- Chief structural engineer: William LeMessurier
- External structure: V-shaped chevrons forming strong exoskeleton
- Weight reduction: External structure made building lighter
- Wind vulnerability solution: 400-ton tuned mass damper
- Controlled by computerized sensors
- Designed to counteract swaying
- Calculations showed each side could withstand powerful winds
The Fatal Flaw Discovery
- Hartley's observation: Corner winds posed bigger threat than face winds
- Traditional designs didn't require safety calculations for corner winds
- LeMessurier's alarming discovery upon review:
- Welded joints replaced with cheaper, weaker bolted joints
- Change approved without his knowledge
- Mass damper compensated for weakness under normal conditions
Critical Vulnerability
- Power failure scenario: Storm knocking out power would deactivate sensors
- Building vulnerable to winds of just 112 km/hour without active damper
- Statistical risk: 1-in-16 chance annually of storm hitting NYC with this strength
Secret Emergency Response
- LeMessurier kept discovery from Hartley
- Confidential plan crafted with:
- Architects and Citicorp executives
- City officials
- Covert reinforcement operation:
- Night-time construction shifts
- Reinforcing bolted joints
- No public warning to residents
Hurricane Ella Crisis (September 1978)
- Reinforcement work began mid-August 1978
- Only halfway complete when Hurricane Ella approached
- Emergency evacuation planned: 10-block radius
- Hurricane veered out to sea at last minute
- Reinforcements completed one month later
Cover-up and Revelation
- Press distraction: Newspaper strike during entire reinforcement period
- Covert construction went unnoticed
- Public disclosure: 1995 New Yorker article revealed story
- Hartley learned of her role's significance 17 years later
- Article failed to properly credit Hartley's contribution