I thought the treadmill crane was fictional.
I thought the treadmill crane was fictional.
Tom Scott
Tom Scott
Guédelon Castle Project Overview
- Medieval castle construction in France for 25+ years
- Using historically accurate 13th century plans and techniques
- Experimental archeology + tourist attraction
- Techniques now helping Notre Dame Cathedral reconstruction
- Project timeline: Started 1228, currently year 1253 (moving forward annually)
- Completion expected in ~10 years (35 years total construction time)
- Longer than actual Middle Ages due to educational demonstrations
- Workers spend half time explaining work to visitors
Historical Research Methodology
- Sources: illuminated manuscripts, stained glass windows, financial records
- Collaboration with archeologists, art historians, castellologists
- Some skills never lost, others completely lost and revived from scratch
- Focus specifically on 13th century technology
Castle Design and Purpose
- Built for low-ranking local nobleman (not royal castle)
- Private home with defensive elements
- Features: portcullis, defensive walls
- Defensive features included despite low attack probability in mid-13th century
Treadmill Crane Technology
- Technology dates back to Roman times
- Used in 13th century cathedral construction
- Historical evidence: medieval cranes still exist in cathedral roof timbers
- Canterbury Cathedral has wonderful example
- Two types at Guédelon:
- Single drum winch: 250kg (550lb) capacity, one person operation
- Double drum winch: 500kg (1,000lb) capacity, 360° pivot capability
- Can hoist from quarry and rotate to place exactly on masonry
Safety Modifications
- 21st century health and safety standards applied
- Anachronisms on site: hard hats, steel toe shoes, protective eyewear, masks for sandstone work
- Heavily reinforced scaffolding
- Modern brake system added (no evidence of braking on medieval cranes)
- Not trying to discover medieval injury/death rates
Crane Operation Process
- Carefully managed three-person operation:
- One person responsible for brakes
- One person at base charging cradle
- One person overseeing entire operation (monitoring walker progress)
- Walker inside machine can't see, requires coordination
- Daily capacity: ~3 metric tonnes hoisted
Personal Experience Operating Crane
- Lifted 150-200kg load
- Technique: look at fixed points to avoid dizziness
- Feedback loop: faster walking → faster turning → faster pushing back
- Risk of hitting head on rear axle
- Like walking up steep hill with mechanical advantage ratio similar to 5 flights of stairs (10 meters horizontal = 1 meter vertical)