Keeping the world's longest railroad tunnel safe

Tom Scott

5m 51s

Gotthard Base Tunnel Overview

  • Longest and deepest rail tunnel in the world
  • 57 kilometers through the Alps
  • Called "base tunnel" - built at base of mountain
  • Deepest point: 2+ kilometers of rock above
  • Temperature reaches 40+ degrees without ventilation
  • Motivation: prevent devastating road tunnel fires from turn of century

Traffic Control and Operations

  • 6 freight trains + 2 passenger trains per hour per direction
  • Several trains simultaneously inside both tubes
  • Tunnel divided into three thirds
  • 2 changeover points allow diversion between tubes to bypass disturbances
  • Signal box controls track movement authority
  • Traffic control manages disturbances

Emergency Response Systems

  • Technical problems: train driver attempts system reboot first
  • Firefighting train available to tow out broken trains
  • 2 intervention centers (North and South) - firefighting stations
  • Response time: alarm triggers both firefighting trains within 5 minutes
  • Must reach any tunnel point within 45 minutes
  • Firefighting train = convoy of firefighting trucks on rail
    • Carries water, foam liquid, special equipment, tools
  • 2 emergency stops with water refill capability

Evacuation Procedures

  • Passengers don't walk out (too far - 57km)
  • Train brings passengers to 2 evacuation stations
  • Evacuation tube under pressure with fresh air streaming in
  • Smoke cannot enter, adequate oxygen supply
  • Evacuation train waits at next section
  • Complete tunnel evacuation required within 90 minutes

Prevention Systems - Gantry Scanning

  • Located 15km from south entrance (4-5 minutes travel time)
  • Scans every train at speed before tunnel entry
  • Laser systems measure train profile
  • Detects if load has moved/doesn't respect tunnel profile
  • Heat detection for overheated axles/brakes
  • Track sensors detect unbalanced loads, hot spots, protruding objects
  • 200 alarms per day from measuring stations across Switzerland
  • 30-second confirmation window - automatic stop if not confirmed
  • Problematic trains diverted to side tracks for inspection
  • Owner must resolve issues before journey continuation

TwinMind

Get summaries like this for your own meetings

TwinMind takes notes in the background during meetings, lectures, and calls, then writes the summary for you.

Free plan to get started

No bot joins your calls

Phone, desktop & Chrome apps

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome