Summary by TwinMind · 1h 34m 41s

Summary by TwinMind · 1h 34m 41s

Problem Session 8

Problem Session 8

MIT OpenCourseWare

MIT OpenCourseWare

Course Introduction and Dynamic Programming Overview

  • First of two problem sessions covering dynamic programming in algorithms class
  • Dynamic programming described as "meta-algorithm" or problem-solving approach rather than specific algorithm
  • Follows SRTBOT template: Sub-problems, Relate, Topological order, Base case, Original problem, Time analysis
  • Key concept: memoization to avoid redundant recursive computations (Fibonacci example)
  • Two implementation approaches: recursive with memoization table vs. iterative bottom-up construction

Problem 1: Tim the Beaver's Weather Decisions

  • Tim has n days until final exam, makes daily decisions based on temperature T
  • Rules:
    • Go outside: happiness increases by T
    • Stay inside: happiness stays same (corrected from initial decrease)
    • Constraint: cannot go outside more than 2 consecutive days
  • Sub-problems: X(i) = maximum happiness from day i to day n
  • Recursive cases:
    • Case 1: Stay inside → X(i) = X(i+1)
    • Case 2A: Go out today, stay in tomorrow → X(i) = T(i) + X(i+2)
    • Case 2B: Go out today and tomorrow → X(i) = T(i) + T(i+1) + X(i+3)
  • Base case: X(n) = max(0, T(n))
  • Original problem: X(1)
  • Time complexity: O(n) - n sub-problems, O(1) work each
  • Additional consideration: reconstruct actual plan using decision tracking

Problem 2: File Edit Distance (Minix Operating System)

  • Files are sequences of strings (lines), length ≤ K each
  • Three operations on file A to transform to file B:
    • Add line (expensive, cost = 1)
    • Remove line (expensive, cost = 1)
    • Swap adjacent lines (cheap, cost = 0)
  • Goal: minimum number of non-swap operations
  • Key insight: can only edit file A (not B)
  • Sub-problems: X(i,j) = min work to convert A[i:] into B[j:]
  • Recursive cases:
    • Case 1: A[i] = B[j] → X(i,j) = X(i+1,j+1)
    • Case 2: Delete A[i] → X(i,j) = 1 + X(i+1,j)
    • Case 3: Insert line to match B[j] → X(i,j) = 1 + X(i,j+1)
    • Case 4: Swap A[i] and A[i+1] if beneficial → X(i,j) = X(i+2,j+2)
  • Swap only useful when A[i+1] = B[j] and A[i] = B[j+1]
  • Base cases: X(n+1,j) = n+1-j, X(i,n+1) = n+1-i
  • Time complexity: O(n²) - (n+1)² sub-problems, O(1) work each
  • Runtime includes factor K for string comparisons

Problem 3: Saggy's Block Stacking

  • Saggy has n blocks, each with dimensions (w_i, h_i, l_i)
  • Has at least 3 of each block type, can rotate blocks freely
  • Goal: maximum height tower with strict support condition
  • Key observations:
    • Always align shorter sides together for optimal support
    • Each orientation can appear at most once due to strict support
    • Only 3 orientations per block type matter
  • Preprocessing:
    • Sort block dimensions: w ≤ h ≤ l
    • Create 3 orientations per block: (w,h,l), (w,l,h), (h,l,w)
    • Sort lexicographically, remove duplicates
    • Time: O(n log n)
  • Sub-problems: X(i) = max height using block i and possibly blocks 1 to i-1
  • Recursive relation: X(i) = v_i + max{X(j) : j < i and block j can support block i}
  • Base case: X(1) = v_1
  • Original: max over all i of X(i)
  • Time complexity: O(n²) - n sub-problems, O(n) work per sub-problem

Problem 4: Princess Plum's Mushroom Collection

  • Princess moves on n×n grid from upper-left to lower-right
  • Grid squares contain: mushroom, tree (impassable), or empty
  • Must take "quick path" = exactly 2n-1 squares (shortest possible)
  • Goal: count paths achieving maximum mushroom collection
  • Key insight: quick paths can only move down or right
  • Two-phase approach:
    • Phase 1: Compute K(i,j) = max mushrooms on quick path to position (i,j)
    • Phase 2: Compute X(i,j) = number of quick paths to (i,j) with K(i,j) mushrooms
  • Phase 1 recursion:
    • If tree at (i,j): K(i,j) = -∞
    • Else: K(i,j) = indicator(mushroom at i,j) + max(K(i-1,j), K(i,j-1))
  • Phase 2 recursion:
    • If tree at (i,j): X(i,j) = 0
    • Else: X(i,j) = sum of X values from valid predecessor positions
    • Valid predecessor: path + current mushroom = target mushroom count
  • Base cases: K(1,1) = 0, X(1,1) = 1
  • Time complexity: O(n²) for each phase