The Incredible Logistics of the Tokyo Olympics
Wendover Productions
17m 51s
Olympic Bidding and Selection Process (2011-2013)
- May 2011: IOC solicited bids for 32nd Summer Olympic Games
- Tokyo announced bid intention June 2011 to mark recovery from 20,000 death earthquake
- Competing bids: Madrid, Istanbul, Baku, Doha
- September 2013: Contract signed between IOC, Japanese Olympic Committee, city of Tokyo for 2020 Summer Olympics
- 7-year planning period for tens of thousands of athletes, millions of spectators, billions of TV viewers
Host City Contract and Operational Requirements
- 273-page operational requirements document serves as "bible" for Olympic organizers
- Minuscule details specified:
- Weather stations required at outdoor venues 3 years prior to games
- 16-day duration with preliminary competitions allowed before opening ceremony
- Massive accommodation requirements:
- 41,177 hotel rooms needed for media, marketing partners, IOC executives, representatives
- Equivalent to close to half of Tokyo's total hotel rooms
- Planned cruise ships in Tokyo Bay as temporary hotels (before international spectator ban)
Olympic Village Construction and Requirements
- Standard since 1932 Los Angeles Games
- Must be within 50km (31 miles) or 60-minute drive of all venues
- Tokyo village capacity: 16,000 people (small town scale)
- Room size requirements:
- Single rooms: minimum 97 sq ft (9 sq meters)
- Double rooms: minimum 129 sq ft (12 sq meters)
- Required facilities: merchandise store, bank, photo store, hair salon, florist, dry cleaning, travel agent, post office
- McDonald's provides free food to athletes for publicity
- Must include designated place of mourning
Venue Strategy and Cost Management
- Three venue categories used in Tokyo:
- Temporary venues for specialized sports (canoeing, climbing, beach volleyball, sailing)
- Pre-existing venues (Tokyo Metropolitan Gymnasium for table tennis, same as 1964 Olympics)
- New permanent venues (Olympic Aquatic Center for swimming/diving)
- Cost consciousness increased due to horror stories:
- Turin 2006: village now derelict, inhabited by squatters
- Sydney 2000: successful redevelopment into neighborhood with 6,000 events/year
- Modern trend: fewer cities bidding (Paris 2024, LA 2028 awarded by default with zero competition)
New Venue Development and Post-Games Planning
- Bureau of Olympic and Paralympic Games Tokyo 2020 must justify long-term value
- Olympic Aquatic Center post-games plan:
- Redeveloped into competition venue and community recreation center
- Projected 1 million visitors/year after games
- Expected to run at small loss comparable to other public recreation centers
- Ariake Arena (volleyball): expected to turn profit after games
- Strategy: create appealing neighborhood following Sydney 2000 model
Venue Standards and Technical Requirements
- 42 total venues must meet strict standards:
- Olympics flag and international sporting federation flag displayed conspicuously
- Full backup power system for broadcast, media, sport, security operations
- Lighting systems split into two sections with independent power supplies
- Sport-specific standards set by international federations:
- Olympic rowing managed by International Rowing Federation
- Course requirements: 531 feet (162 meters) width, 2,162 meters (7,126 feet) length
- Detailed specifications for buoy systems, advertising banner placement, timing huts
Broadcasting Operations and International Broadcast Center
- 73% of Olympics total revenue from television rights alone
- Olympics Broadcasting Services (OBS) established as host broadcaster for all games since 2008 Beijing
- OBS staff: 166 employees normally, 8,100 during games
- Tokyo production scale:
- 9,500 hours of content (most ever for Olympic games)
- 1,049 cameras deployed
- 3,600 microphones across 42 venues
- Up to 64 world feeds produced simultaneously
- International Broadcast Center located at Tokyo Big Site (largest convention center)
- 24/7 operation with town-like facilities: restaurants, coffee shops, bars, medical center, bank, convenience store, dry cleaners, massage room
Broadcasting Services and Pricing
- OBS acts as landlord renting workspace to broadcasters
- Private office pricing:
- 270 sq ft (25 sq meters) units: $5,011 per unit for games duration
- Two wall plugs: $876
- Power strip: $27
- 100 Mbps ethernet: $1,904
- Additional services:
- Digital data feed for real-time results, schedules, medals, records, news, statistics
- Walkie-talkie rental: $438
- Small folding table: $67
- Microwave: $105
- Electric kettle: $23
- 6,000 accredited journalists awarded access to Tokyo games
Planning Philosophy and Execution
- Goal: consistency with previous games (2016, 2012, 2008)
- Host city follows incredibly detailed instructions over decade-long preparation
- Tasks range from small (placing correct flags) to massive (building entire stadiums)
- 2020 games postponed to 2021 due to coronavirus pandemic