The Islands With Too Much Power
Tom Scott
5m 29s
Power Grid Balancing Fundamentals
- Power grids must balance supply and demand constantly
- Too little power: things break
- Too much power: things break worse
- No battery large enough for daily national demand peaks/troughs
- Grid engineers ensure generated power matches consumed power
- Existing technologies assume supply/demand balance over hours
- Pumped storage (lake as giant battery)
- Lithium ion setup in Australia (caught fire once)
Orkney Islands Energy Profile
- Located far northeast Scotland
- Population: 22,000 people across ~1,000 windswept square kilometers
- Problem: Too much renewable energy from wind, waves, tides
- 2013: Producing up to 130% of electrical needs
- Demand range: 7-46 megawatts (varies by time/season)
- Always windy conditions enable consistent generation
Current Energy Infrastructure
- Multiple commercial wind farms
- 500 domestic turbines (privately owned)
- 1 in 12 households generate own power
- Profitable after installation costs
- Backup: interconnected cables (40 megawatts from Scottish mainland)
- Various renewable experiments:
- Electric hybrid plane testing at airport
- Tidal power experiments
- Wave power experiments
- Limited solar power
Solution 1: Turbine Curtailment
- Current practice: shut down turbines when network can't handle load
- Active network management controls turbine operation
- Moratorium on new grid connections
- Limited micro generation potential
- Assessment: Complete waste in area with best generation potential
Solution 2: Enhanced Grid Interconnection
- Current interconnector capacity: 40 megawatts (insufficient)
- Estimated potential:
- 2,000 megawatts tidal/wave generation locally
- 17,000 megawatts offshore wind within few hundred kilometers
- Existing interconnector built for old coal-burning era
- Proposed new interconnector:
- Cost: £250 million
- Would handle all reasonable future turbine capacity
- Could power most Scottish Highlands
- Political challenge: Government requires turbine approval before interconnector approval
Solution 3: Increased Local Consumption
- Higher electric car adoption than anywhere else in Scotland
- Most vehicles still use petrol/diesel
- Oil heating still common
- Ferries burn fossil fuels
- Transition challenges: People won't scrap functional equipment
- Plans exist for gradual transition
Hydrogen Fuel System Implementation
- Operational for years to absorb excess power
- Process: Electricity → fresh water electrolysis → hydrogen + oxygen
- Oxygen discarded, hydrogen compressed for fuel cell use
- Current application: Ferry power when docked at night
- Saves running engines or drawing grid power
- Equipment status: Experimental, inefficient, finding challenges
- Purpose: Test bed for scaling up technology
Global Implications
- Orkney as world's fastest renewable transition
- Test bed for planetary changes
- Lessons learned will guide global implementation
- Changes appear normal to locals despite being years ahead globally