Accelerated Pavement Testing Overview

  • Industrial companies/research labs need to test new road surfaces/building methods for long-term durability
  • Roads must last decades - need to simulate hundreds of thousands of vehicles over years without actual time investment
  • Solution: "accelerated pavement testing facility" - only few exist worldwide

French Fatigue Carousel Facility

  • Built 1984, located in west France
  • One of world's largest accelerated pavement testing facilities
  • Central tower with hydraulic motors powering machine
  • Four arms with outer wheels that load pavements
  • Ring length: 120 metres
  • Test section width: 6 metres
  • Simulates 10-20 years real road traffic in few months

Testing Applications & Evolution

  • Originally used to validate French pavement materials
  • Current new applications:
    • Bio-binders testing to replace bitumen (petroleum will disappear)
    • Electric vehicle road charging systems research

Technical Specifications & Capabilities

  • Maximum speed: 100km/h
  • Usual testing speed: 70km/h (safety margin from maximum)
  • Load range per single axle: 4.5-8.5 tonnes
  • Can overload pavement to accelerate deterioration
  • Wheel configurations: single wheels, dual wheels, two axles, three axles
  • Lateral wheel movement capability to reproduce real traffic effects
  • 1000-horsepower engine powering system

Instrumentation & Monitoring

  • Soil instrumentation:
    • Displacement transducers
    • Vertical strain transducers for vertical displacement measurement
  • Bituminous layer instrumentation:
    • Strain gauges (most common)
    • Temperature sensors (critical for pavement response)
    • Accelerometers/geophones for vertical acceleration measurement

Facility Infrastructure

  • Three different circular test tracks
  • Carousel can be disassembled and moved between tracks
  • Parallel testing capability: one track testing while another rebuilt
  • Track sectioning allows multiple simultaneous tests
  • One watertight track for wet/soaked ground pavement testing

Testing Duration & Process

  • Tests run continuously for months
  • Constant rotation with wheels at up to 100km/h
  • Years of pavement stress/damage compressed into weeks
  • Takes minutes to reach operating speed

Testing Limitations & Validation

  • Cannot control climate conditions (accelerated test limitation)
  • Cannot simulate bituminous material aging (materials become more brittle over time)
  • Validation method: include reference section with known material
  • Comparison with classical materials using correction coefficients
  • Results adapted to real conditions through coefficient adjustments

Real-World Testing Necessity

  • 21st century computer modeling/simulation requires real-world data foundation
  • Public safety and billion-euro infrastructure projects demand physical testing
  • No substitute for building real test sections for validation