The Rapid Rise of Korean Shipbuilding
Asianometry
17m 47s
Historical Context & Global Shipbuilding Leadership
- 1975: South Korea ship production = 1/6 of West Germany's volume
- 1990: South Korea exceeded all of Europe combined
- Today: Korea one of three dominant shipbuilding nations (with Japan, China)
- Ships = major Korean export sector alongside cars, semiconductors
Early Global Shipbuilding History
- Start 1800s: US led world shipbuilding (wooden ships, abundant timber)
- 1850s: UK took leadership (naval contests with Holland, timber shortages)
- 1882: UK held 80% world shipbuilding market share
- WWII: Leadership passed to US (new welding technologies)
- 1940-1945: America produced 90% of world's ships
- Post-WWII: Japan took over leadership
- Ships destroyed during war, dependent on overseas trade
- Government focused on replenishing stock
- Encouraged by American economic recovery funds, Korean War
- 1974: Japanese builders took 40% share of 28,370 ship orders
Korean Historical Shipbuilding Background
- Korea surrounded by three seas + major river
- Regularly competed with Chinese/Japanese for naval power
- Chosan period: maintained credible naval force for 500 years
- 1597 Battle of Mong-yang: small Korean force defeated larger Japanese navy
- Famous turtle ships: heavy armor, unique traditional design
- Transport ships: up to 19m long, carry 75 tons cargo
- 1895: naval force disbanded, ended large ship construction
- Japanese colonial period: Japanese companies monopolized industry
- Built small-medium ships during occupation
Post-WWII Korean Shipbuilding Foundation
- Korean government took over Japanese facilities/equipment
- Korea Shipbuilding & Engineering Corporation (KASEC) established
- Based in Busan
- Originally started by Mitsubishi 1937
- Korea's biggest, most advanced builder (though limited)
- 1960s achievement: converted production from wooden to steel ships
- Production volumes:
- 1960: 4,224 tons capacity
- 1965: 13,780 tons
- 1970: 39,189 tons
- 1969: exported 20 tuna fishing ships to Taiwan
- KASEC later went bankrupt, taken over by Hanjin Group
Shipbuilding Industry Value Chain
- Design phase: assembler works with customer on specifications, schedules
- Supplier coordination: engine, steel plating, power generation (long lead times)
- Steel preparation: thousands of plates cut, bent, prepared
- Hull assembly: building blocks create hull structure
- Outfitting: thousands of pipes, electrical cables, furnishings, machinery
- Welding: align and weld prefabricated parts
- Painting: now done throughout cycle (was production bottleneck)
- Commissioning: flood quay, test systems
- Assembly industry: 20-30% value from shipyard, 70-80% from suppliers
- Complex vessels: research vessel 550,000 parts, cruise ship 900,000 parts
Government Industrial Policy & POSCO
- 1960s: Park Chung-hee government promoted heavy/chemical industrialization
- Shipbuilding targeted industry: subsidies, tax exemptions for equipment
- 1968: established POSCO (Pohang Iron & Steel)
- Used retired Nippon Steel executives, Japanese reparations capital
- Today: world's 6th largest steel maker (2021)
- Domestic steel industry essential for shipbuilding development
- Drove growth in automobiles, railroads, containers, construction
Government Ambitious Goals
- 1971: KASEC received order for 6 oil carriers (20,000-30,000 tons)
- 1973: government set public goal
- 3 shipyards capable of 1 million tons gross tonnage by 1976
- By 1980: satisfy domestic demand + export 3.2 million tons capacity
- Seemed irrational given mediocre state of Korean shipbuilding
Hyundai Heavy Industries Entry
- Hyundai Heavy = subsidiary of Hyundai Group
- Chairman Chung Ju-young: aggressive businessman
- Korea's largest chaebol: automobiles, engineering, construction
- Original plan: 3 medium shipyards (150,000-200,000 tons each)
- Revised: 1 super large shipyard (1 million ton capacity)
- Location: Ulsan Mipo Bay (easy access to raw materials, POSCO steel)
First Major Contract & Challenges
- 1972: won first order from Greek shipping tycoon George Livanos
- 2 very large crude carriers, 260,000 tons capacity each
- Requirements: exactly same as recent Scott Lithgow (Scotland) ship
- Problem: shipyard construction not yet finished
- Solution: build ships and yard simultaneously
Technology Transfer Efforts
- Late 1960s: Chung discussed joint ventures with Japanese/Norwegian companies
- Japanese forbade transfer of advanced shipbuilding/welding techniques
- AG Weser (West Germany) licensing fell through due to cost
- 1971: Chung met Charles Brook-Longbottom (former MP)
- Chaired Scottish firm A&P Appledore
- Today: UK's largest ship repair/conversion company
- Appledore offered training: shipyard design, development, staffing, operations
- For 260,000 ton carriers: Appledore reached out to Scott Lithgow
- One of only 3 UK yards capable of building such ships
Ulsan Shipyard Construction & Training
- March 1972: broke ground on massive Ulsan shipyard
- First cohort: 70 engineers (middle managers, foremen) from elite Korean universities
- Sent to Scotland for training, daily reports back to Korea
- Quote: "trying to do in few years what Western countries took many years"
- Replication strategy: used Scott Lithgow drawings, same European suppliers, same raw materials
- Scott Lithgow reviewed size/thickness of each plate
- Scott Lithgow director: "if we didn't train them, someone else would... contributing to our own eventual downfall"
- Japanese involvement: Kawasaki shipbuilding contributed work procedures
Early Production Challenges
- Could not replicate ship 100% despite foreign help
- Very large crude carriers built in 2 separate halves, then joined
- First ship (Atlantic Baron): two halves didn't fit
- Set up new design office to monitor construction
- Everyone worked overtime 6am-3am
- Delivery delays: October 1973 → February 1974
- Second ship also delayed
1973 Oil Crisis Impact
- Wiped out demand for large floating oil carriers
- European shipbuilding activities fell 90% from mid-1970s peaks
- Livanos refused delivery
- Hong Kong and Japan customers also refused delivery
- Common in oversupply times, left Hyundai in tight spot
Chaebol Advantages & Government Support
- Hyundai started own shipping company: Hyundai Merchant Marine
- Serviced General Trading Company
- HMM absorbed the new ships
- Government passed law: all crude oil deliveries to Korea on Korean-owned vessels
- Today: HMM one of world's biggest transportation/shipping companies
- Hyundai group synergies:
- Hyundai Construction: frontline supervisors, feasibility studies
- Hyundai Motors: dispatched engineers to reduce throughput time
Skill Development & Improvement
- Hired ex-Appledore employees to train technicians
- Skills: gas cutting, piping, sheet metal, drawing
- More transfer agreements with European companies
- Gradually acquired: design modification ability, engine production, cost structure improvement
- Throughput time reduction for delivery deadlines
- Ship inspection pass rates:
- 1973: 38.1%
- 1976: 84.1% (on par with developed countries)
Other Chaebol Entry
- December 1978: Daewoo took over partially completed shipyard in Okpo
- Originally owned by KASEC
- Finished 1981 with state support
- September 1979: Samsung acquired Coro shipbuilding
- Both followed Hyundai path: absorbed European technology
- Daewoo worked with Scotland's Appledore
- Samsung worked with Danish firm Burmeister & Wain
Rapid Growth Period
- 1976-1985: Korean shipbuilding grew 30% annually
- Despite multiple oil shocks (may have helped gain share)
- Terrible shipping conditions eliminated international competition
- 1985 Plaza Accord: revalued Japanese yen, gave Korean ships cost advantage
Japanese Competition
- Remained formidable competitor despite currency disadvantage
- Advantages: larger merchant fleet, 60% higher labor productivity
- Integrated steel mills as efficient as POSCO
- Government procurement systems kept domestic demand stable
- Japanese labor cost 2.5x more than Korean labor
Industry Consolidation
- 1989: Korean government realized shipbuilding capacity overheated
- Margins: estimated 2.8% in early 1980s, edging toward oversupply
- Government streamlined industry: prohibited new shipyard builds until 1993
- Pushed companies to improve cost structures
- Wave of consolidation began
Asian Financial Crisis Impact
- 1997: several chaebol (Hyundai, Daewoo) broke apart due to debt
- Korean shipbuilding industry gained share vs world competitors
- Korean won crash made ships even cheaper
- Strong worldwide market: annual orders soared 22M → 37M gross tonnage
- 2000: South Korean builders finally surpassed Japanese in orders received
- Hyundai, Daewoo, Samsung retained dominance since
Current Status & Future Challenges
- 2020: 4% of South Korea's exports are ships
- Korea's LNG and crude carriers among world's best
- Intensely competitive industry
- China followed similar path, became world's second largest ship exporter
- Challenge: shipbuilding industry declines as labor gets more expensive
- Must improve labor productivity or lose competitiveness
- China's labor costs and industrial policies heavily backing their builders
- Korean government and chaebol need to retain leading position