Wixom Lake and Edenville Dam Background

  • Wixom Lake: human-made reservoir on Tittabawassee River created by Edenville Dam
  • Features: marina, waterfront church camp, lakeside campground, small neighborhoods
  • Edenville Dam: unexceptional until 2020 failure
    • Earth dam (clay, rock, sand) - 6,000 feet wide, 52 feet tall
    • Built for electricity generation with twin 2.4 megawatt generators
    • Peak output: 0.36% of Glen Canyon Dam power
    • Could electrify 34,000 households in Midland County, Michigan
    • Built with private funds ~100 years ago

Dam License Revocation and Operational Issues

  • Boyce Hydropower LLC received federal shutdown order in 2018
  • Inability to meet federal regulations
  • Power struggle between dam owners, lakeside property owners, regulators
  • Lake levels fluctuated below operating levels
  • Core issue: spillways too small for flood capacity requirements

May 2020 Failure Event

  • Rain began May 14, 2020, intensified May 18
  • Initial water level: below lower operational limit
  • May 19: 3 inches (8 cm) rain fell
  • Lake levels rose: 2 feet (60 cm) in 24 hours, then 1 foot in next 6 hours
  • Dam failed along eastern edge - static liquefaction, not overtopping
  • Consequences:
    • 2,500 structures flooded
    • $200 million damages
    • 10,000 evacuated
    • No deaths

Failure Analysis - Static Liquefaction

  • Dam didn't overtop or erode
  • Static liquefaction: soil progressive loading until functions as liquid vs solid
  • Rare phenomenon, not well understood/documented
  • Singular event, but not just "bad luck"
  • Spillways could only safely open gates to 7 feet height
  • Dam/operators couldn't keep up with maintenance requirements

National Dam Safety Crisis

  • US total: 91,000 dams (Michigan: ~2,600)
  • 8,000 dams considered deficient in design/maintenance
  • 403 dams: "unsatisfactory" condition + "high" hazard rating
    • Deficiency requires immediate/emergency action
    • Failure would cause probable fatalities

Case Study: Lake Hodges Dam, San Diego

  • Century-old structure cracking/crumbling
  • Inadequate spillway capacity for maximum probable flood
  • Failure scenario: <2 hours for inundation up to 23 feet deep
  • Thousands at risk along San Diego River banks
  • Regulators believe fatalities inevitable if failure occurs

Historical Dam Building Boom (1960-1980)

  • 31,000 dams built in US (>1/3 of current total)
  • Global phenomenon: dams seen as perfect energy solution
  • World Bank major financier of large dams worldwide
  • Theoretical benefits: employment, cheap electricity, industrial development, flood control, irrigation

Environmental and Social Costs

  • Massive geographical alteration
  • Lake Kariba example: >2x Luxembourg size, 58,000 people displaced
  • Guatemala Chixoy Dam: 3,500 displaced, 444 murdered for resisting
  • Argentina-Paraguay Yacyreta Dam: 20,000+ displaced
  • Health impacts: malaria, dengue fever from enlarged mosquito habitat
  • Species extinction from habitat destruction

World Bank Policy Shift

  • 1994: 2,000 NGOs signed Manantali Declaration for dam financing moratorium
  • 10 million people displaced by World Bank dam projects
  • World Commission on Dams formed (World Bank + International Union for Conservation)
  • 404-page report conclusion: dam benefits overstated, costs understated
  • Result: World Bank and global community slowed dam development

Economic Reality Check

  • Hydropower no longer cheapest electricity source
  • Multiple fossil fuels cheaper
  • Solar and wind now beat hydropower prices
  • Environmental concerns: reservoir creation kills plants, generates greenhouse gases
  • First decade emissions can match equivalent firepower plant

Private Ownership Problem

  • 65% of US dams privately owned
  • Edenville example: Boyce Hydropower LLC
    • Small investment vehicle owned by Boy Scouts founder's trust
    • Bought dam knowing expensive upgrades needed
    • $8 million required for federal compliance
    • Company claimed inability to afford upgrades
    • License revoked, upgrades never made

Climate Change Amplification

  • Rising global temperatures = more water vapor = stronger storms
  • IPCC 6th report findings:
    • Worst decade storms already 6.7% wetter
    • 2°C temperature rise = 14% intensity increase
    • 50-year worst storms intensifying even faster
  • Dams designed for old worst-case scenarios
  • Current worst-case scenarios rapidly escalating

Recent Warning Signs

  • 2017 Oroville Dam incident
  • Spillway concrete base broke during heavy rainfall
  • Emergency spillway use caused hillside erosion
  • Erosion marched uphill toward dam foundation
  • Near-collapse scenario avoided only when rains stopped
  • Demonstrated inadequacy of aging infrastructure

Rising Failure Trend

  • Dam failures increasing globally

TwinMind

Get summaries like this for your own meetings

TwinMind takes notes in the background during meetings, lectures, and calls, then writes the summary for you.

Free plan to get started

No bot joins your calls

Phone, desktop & Chrome apps

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome

Your next meeting, summarized like this

TwinMind listens in the background and turns meetings, lectures, and calls into searchable notes you can chat with. Start free.

Available on phone, desktop & Chrome